MRT LINE 2, S201 PACKAGE, Kuala Lumpur

The SSP Line is the second line of the Klang Valley Mass Rapid Transit (KVMRT) project to be developed. The project is developed by MMU-Gamuda and it official launched in July 2017. The alignment will have a length of 52.2km, consisting of 38.7km of elevated tracks and 13.5km running through underground tunnels. Several stations on Sungai Buloh-Serdang-Putrajaya Line are awarded by Sunway Construction to us, included Damansara Damai, Sri Damansara East, and Sri Damansara West. The project is completed in 2019.

BUILDING TYPE INFRASTRUCTURE
DEVELOPER MASS RAPID TRANSIT CORPORATION SDN BHD
MAIN CONTRACTOR SUNWAY ENGINEERING SND BHD
ARCHITECT /CONSULTANT SEPAKAT SETIA PERUNDING SDN BHD
PRODUCTS /SERVICES FIRE PROTECTION SYSTEM