XinTianDi, Genting phase 2
Xin Tian Di Genting Phase 2 – PROPOSED MIXED DEVELOPMENT (STRATIFIED AND PHASED) COMPRISING: PHASE 1: Partial podium car park (CP) from Level LG9 to Ground Level; One (1)-storey commercial complex comprising 136 units from Level LG7 to Level LG4; One (1) unit car park management office space located at Level LG7; One (1)-storey commercial complex comprising 132 units from Level LG4 to Level LG2; One (1)-storey commercial complex comprising 37 units from Level LG7 to Level LG2; and Bus station on PT 25822 & PT 25823, Genting Permai, Mukim Bentong, District of Bentong, Pahang Darul Makmur. For: Aset Xintiandi Sdn. Bhd.
Colt Engineering was engaged on this project to undertake the supply, delivery, installation, testing, commissioning, and maintenance of the fire-fighting installation scope, ensuring full compliance with safety standards and regulatory requirements for commercial lots.
| BUILDING TYPE | MIXED DEVELOPMENT |
| DEVELOPER | ASET KAYAMAS + GENTING MALAYSIA |
| MAIN CONTRACTOR | ASET KAYAMAS |
| ARCHITECT /CONSULTANT | JY CONSULT |
| PRODUCTS /SERVICES | FIRE PROTECTION SYSTEM |


